Hydropower Regulatory Efficiency Act of 2013

By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-36.

Official summary

Version 01 · Reported to Senate with amendment(s) · May 13, 2013

Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements.

(Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements.

Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria.

Showing the opening paragraphs of the official summary.

Read full official summaryShow less

Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements.

Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.

Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence.

(Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects.

(Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.

Read the summary on Congress.gov
PlainBill analysis is coming later. This page presents official source data. We have not yet published a PlainBill explanation for this bill.

Who introduced it

Sen. Murkowski, Lisa [R-AK] · R–AK

Committees

  • Energy and Natural Resources Committee
12 cosponsorship records, including any withdrawals

Actions

A procedural vote is different from passage. Passage in one chamber does not establish enactment. Explore the glossary.

  1. By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-36.

  2. By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-36.

  3. Placed on Senate Legislative Calendar under General Orders. Calendar No. 69.

  4. Committee on Energy and Natural Resources. Reported by Senator Wyden with an amendment in the nature of a substitute. Without written report.

  5. Committee on Energy and Natural Resources. Reported by Senator Wyden with an amendment in the nature of a substitute. Without written report.

  6. Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

  7. Committee on Energy and Natural Resources. Hearings held. Hearings printed: S.Hrg. 113-24.

  8. Read twice and referred to the Committee on Energy and Natural Resources.

  9. Sponsor introductory remarks on measure. (CR S1787)

  10. Introduced in Senate

Bill text & related measures

Text links open the official source. We currently store references to these documents.

Related bills identified by Congress.gov

Source last updated: Sep 8, 2026. Consult Congress.gov for the current record.

Explore the bill from different angles

Choose a perspective, copy a prompt, and paste it into your preferred AI. Each prompt includes the bill version and available official source links, and asks for counterarguments as well as supporting evidence.

Neutral evidence review

Objective

Analyze S.545 as objectively as possible. Explain its main provisions, who would be affected, possible benefits and harms, implementation, exceptions, and uncertainties. Present the strongest arguments for and against it, and identify evidence needed to assess its public impact.

View full prompt & sources
Fairness and public impact

Progressive lens

Examine S.545 through a progressive lens, focusing on fairness, access, economic inequality, and effects on vulnerable communities. Explain potential benefits, costs, and unintended consequences. Consider the strongest counterarguments and distinguish stated goals from demonstrated outcomes.

View full prompt & sources
Institutions and government scope

Conservative lens

Examine S.545 through a conservative lens, focusing on fiscal responsibility, institutional stability, federalism, and the scope of government. Explain potential benefits, costs, and unintended consequences. Consider the strongest counterarguments and any provisions that challenge this perspective.

View full prompt & sources
Individual rights and government power

Liberty lens

Examine S.545 through a civil-liberties and limited-government lens. Consider individual rights, privacy, voluntary choice, accountability, and government power. Explain tradeoffs, possible safeguards, and the strongest counterarguments without assuming the proposal is beneficial or harmful.

View full prompt & sources